The Head Office for The West Kowloon Cultural District Authority
Client
The West Kowloon Cultural
District Authority
Scope
Fit Out, Building Services
Size
70,902 sq ft
Completion
April 2021
Client
10.5 months
TCG Construction delivered the West Kowloon Cultural District Authority’s Head Office, providing comprehensive pre-construction, fit-out, and building services to create a functional and inspiring workspace.
The office spans seven floors within a mixed-use tower designed by Herzog & de Meuron, part of the M+ Museum complex. A standout feature is the four-story atrium with a suspended steel, glass, and oak staircase, offering panoramic views of Hong Kong’s skyline.
Client
The West Kowloon Cultural District Authority
Scope
Fit Out, Building Services
Size
70,902 sq ft
Completion
April 2021
Client
10.5 months
TCG Construction delivered the West Kowloon Cultural District Authority’s Head Office, providing comprehensive pre-construction, fit-out, and building services to create a functional and inspiring workspace.
The office spans seven floors within a mixed-use tower designed by Herzog & de Meuron, part of the M+ Museum complex. A standout feature is the four-story atrium with a suspended steel, glass, and oak staircase, offering panoramic views of Hong Kong’s skyline.
Client
The West Kowloon Cultural District Authority
Scope
Fit Out, Building Services
Size
70,902 sq ft
Completion
April 2021
Client
10.5 months
BUILT LOCALLY, INSPIRED BEYOND
Sign up for our newsletter and receive exclusive insights, project updates, and industry news delivered straight to your inbox.
BUILT LOCALLY, INSPIRED BEYOND
Sign up for our newsletter and receive exclusive insights, project updates, and industry news delivered straight to your inbox.